What is “CC” / ‘A’ sites & “DC” / ‘B’ Sites of Petrol Pump?
“CC” / ‘A’ sites, “DC” / ‘B’ sites and CFS sites of petrol pump will be decided by the Oil companies and the same would as follows: –
Dealer Owned sites (“DC”/ “B” sites): The offered land and the super structure will be developed by the dealer. Pump, tank, automation, signages, etc. will be provided by the Corporation.
Other Corporation Owned Sites (“CC”/ “A” sites): The offered land would be taken on lease/purchased and fully developed as Corporation owned site.
Locations under Corpus Fund Scheme (CFS sites): The offered land would be taken on lease/purchased and fully developed as Corporation owned site.
Note: Offered land can either be taken from the applicant or the owner of the land directly. All locations advertised as SC/ST category will be developed as per (i) above.
Visit : https://www.petrolpumpdealerchayan.in/
Also Read- IOCL, HPCL, BPCL Petrol Pump ADVERTISEMENT 2023
Different between all Kind of Sites of Petrol Pump
Difference between all kind of sites in respect of Type of facility:
S.N. | Type of Facility | TYPE OF SITE | |
“A” / “CC” site including CFS locations | “B”/ “DC”
Site |
||
Provision of Facility by: | |||
A | Infrastructural Facilities: | ||
i. | Developed land including land development of the entry / exit / acceleration / de-acceleration / service road with boundary /compound /
retention wall as per OMC Specification |
Dealer | Dealer |
ii. | Tanks, Dispensing Units, Signages,
Automation, etc. |
OMC | OMC |
iii. | Sales Office, Storeroom, Toilet, Electrical Room, Electrical connection (of capacity
as advised by OMC), Water Connection, Yard Lighting, etc. |
OMC | Dealer |
iv. | Generator / Invertor | Dealer | Dealer |
v. | Compressor with Electronic Gauge for Air
Filling (As decided by OMC) |
OMC / Dealer | Dealer |
vi. | Driveway | OMC | Dealer |
vii. | Canopy (as per OMC’s requirement) | OMC | Dealer |
B | Customer Convenience Facilities: | ||
i. |
Clean Drinking Water, Maintenance of Neat & Clean Toilet, Telephone, etc. |
Dealer |
Dealer |
Land Requirement for CC/DC / CFS Sites of Petrol Pump
Land area depend on the type of site and type of Retail Outlet.
- Regular /Rural (SH/NH)
35 m X 35 m = 1225 sq. metre.
30 m x 30 m = 900 sq. metre.
25 m x 25 m = 625 sq. meter.
- In Municipality limit (Town)
20 m x 20 m = 400 sq. meter
Working capital requirement for operation of Retail Outlet (ROs.)
Types of Site | Type of Retail Outlet | Amount Required (in Rs) |
CC/DC | Regular | 32 Lakh |
CC/DC | Rural | 16 Lakh |
Minimum Bidding Fee (CC / ‘A’ site) & Fixed Fee (DC / ‘B’ site)
Types of Site | Type of Retail Outlet | Amount Required (in Rs) |
CC | Regular | 30 Lakh |
CC | Rural | 10 Lakh |
Types of Site | Type of Retail Outlet | Amount Required (in Rs) |
DC | Regular | 15 Lakh |
DC | Rural | 5 Lakh |
SECURITY DEPOSIT (REFUNDABLE) OF SITES OF PETROL PUMP
Category | Types of RO | Rs in Lakh | ISD (10% of Security Deposit) |
Open | Regular | 5 | 50,000/- |
Open | Rural | 4 | 40,000/- |
OBC | Regular | 4 | 40,000/- |
OBC | Rural | 3 | 30,000/- |
SC/ST | Regular | 3 | 30,000/- |
SC/ST | Rural | 2 | 20,000/- |
Note: Interest Security Deposit (ISD)
Investment Required for Development of Infrastructure at RO
Types of Site | Type of Retail Outlet | Amount Required (in Rs) |
CFS | Regular/Rural | 0 Lakh |
CC | Regular | 12 Lakh |
DC | Regular | 75 Lakh – 95 Lakh |
DC | Rural | 35 Lakh |
License Fee of different type of sites of petrol pump
- License fee will be Payable by dealer for the investment made by corporation-
1.CC/ CFS Site (“A”)
Petrol : Rs 435.83 /KL = Rs 0.44 (Approx.)
Diesel : Rs 363.19 /KL = Rs 0.37 (Approx.)
- DC / “B” Site
Petrol: Rs 196.51 /KL = Rs 0.20 (Approx.)
Diesel: Rs 163.76 /KL = Rs 0.17 (Approx.)
Documents Required
a)Notarized Affidavit by the applicant as per Appendix-X A /X B (Standard Affidavit).
b)Proof of age (date of birth) i.e., – Self Attested Copy of 10th Std. Board Certificate / Secondary School Leaving Certificate / Birth Certificate / Passport / Identity card issued by Election Commission / Identity card issued by Election Commission/PAN card/Aadhar card. *
c)Proof of educational qualification i.e. – Self Attested Copy of Certificate of passing 10th Std. issued by a Board / School conducting the examination or equivalent. *
d)Appendix – III (consent for offer of land) if applicable.
e)Copy of land documents in support of ownership / lease rights.
f)Sketch/Site map of the offered land with dimension.
Land Evaluation of petrol Pump:
- Under Land Evaluation, following parameters will be evaluated:
- Land in Advertised area
2.Land Dimension as per requirement.
3.Land meet NHAI norms
4.Land has no HT Line (>11 KVA) crossing.
5.No Nallah
6.No toll Plaza within 1 km
7.No forest Land
Land not meeting any of the above parameter will not be considered and will be rejected. However, the candidates would be considered for selection along with Group 3 applicants and intimation will be sent to the candidate.
To understand this watch full video: